Construction of the new bunker as progressed well over the recent months.
The base/front/side structure now situated on the loco, shown in the first three photos, while the back of the bunker is still located on the frame of the old bunker, shown in the last two photos.
These three images were taken 4th June 2011 showing the bunker assembly coming together on the loco. The other bunker side should be trial fitted next - so far everything lines up!
The platework for the back of the bunker, not too far now from completion, but still requiring some welding and a lot of drilling.
A view from inside the bunker of the new curved sheet behind the top lamp bracket.